Homework acceptance must be step-by-step to carry out hidden work is particularly important

Home decoration acceptance is an important step in home decoration. Acceptance of all parts of home improvement can avoid some quality problems after home improvement is completed. The acceptance of home improvement is divided into three stages: initial stage, middle stage, and late stage, and the acceptance items at each stage are different. Especially the acceptance of the hidden project in the middle stage is particularly important for the overall quality of home improvement.

I. Initial acceptance of home improvement acceptance

The most important thing in the initial acceptance is to check whether the incoming materials (such as putty, plastics, etc.) are consistent with the materials on the budget sheet in the home improvement contract, and in particular whether the brands of the hydropower reform materials (electric wires, water pipes) belong to the special brand of the home improvement company. Avoiding miscellaneous materials in the incoming materials affects later construction. If the owner finds that the entry material is different from the brand in the contract, he can refuse to sign the material acceptance form until he negotiates with the home improvement company and signs again.

Second, the acceptance of the home acceptance

General home improvement can be carried out about 15 days for mid-term acceptance (villa construction time is relatively long), the mid-term acceptance is divided into the first acceptance and the second acceptance. The first acceptance involved items such as ceilings, water circuits, and wood products. The second acceptance was specifically for the use of waterproof rooms in home improvement. Therefore, the medium-term project is the most complicated step in the inspection and acceptance of home improvement. The acceptance of the project will affect the performance of multiple home improvement projects in the later period.

1. Circuit reconstruction: When accepting the circuit, it must be noted whether the used wire is the brand of the home improvement company and whether the wire is up to standard. The non-compliance of wires has the condition of thin blister cores or coarse copper cores. These two non-compliant wires have an impact on the current load, which leads to potential safety problems for the owners in future use.

When checking the circuit modification, check the closed condition of the socket. If the original socket has been displaced, carry out moisture-proof and waterproof treatment at the shifting position, and apply a waterproof tape over 3 layers for sealing. Also check that the circuit joints in the ceiling are also treated with waterproof tape.

2. Waterway reconstruction: The test of the waterway reform is mainly to conduct pressure test. When the pressure is applied, the pressure should not be less than 6kg. The pressure can not be less than 15 minutes. Then check whether the pressure gauge has pressure relief. If there is pressure relief, check the pressure. Whether the valve is closed or not, notify the foreman immediately if there is a problem of pipeline leakage, and treat the leakage of the pipeline before proceeding with the next construction.

3, waterproof: waterproof acceptance is another highlight of the mid-term acceptance. In general, rooms with floor drains will be waterproofed. Whether or not waterproof is in place not only affects the daily lives of the owners, but also affects the interests of the owners downstairs. Closed water test is a common method for testing waterproofing in home improvement. When conducting a closed water test, the foreman needs to confirm the closed time with both the owner and the downstairs occupant, and then close the drain hole of the room to put water into the room (water level Not less than 3cm. After 24 hours, ask the owner of the downstairs if there is leakage.

In addition to checking the waterproof of the floor drain room, the owner should also check the waterproof of the shower wall. When inspecting the waterproof wall, you can check whether the paint on the wall is uniform and there is no brushing phenomenon. In particular, check whether the yin and yang angle leak brush. To avoid yin and yang leakage brush causing moldy mildew.

The waterproof height of the wall is also subject to acceptance. Upon acceptance, the owner can check whether the waterproof height of the wall has reached the height promised by the company. Generally, the waterproof height of the shower is about 1.8m, but from an economic point of view, the owner can take a shower. The area is set to a height of 1.8m and the Other areas are set to a height of more than 1.5m.

4, wall tiles, floor tiles: walls, floor tiles are mainly to check the emptying rate and color difference. The owner can use a small hammer to beat the corners of the wall and floor tiles to check for empty drums. The emptying rate of walls and floor tiles cannot exceed 5%, otherwise it will fall off. It is worth noting that the walls and floor tiles are not allowed to have hollows in the middle. The mortar is not full, the grassroots is not properly handled, and the time for the tiles is insufficient may cause hollowing in the middle of the tiles. If the middle hollows appear in the tiles, the owner should ask the foreman to Some tiles are eradicated and re-sticked.

When checking the color difference, pay attention to whether the brand of the tile is the same, whether it is the same batch number and whether it is paved at the same time. The owner can also check the aesthetic appearance of the wall and floor tiles. Under normal circumstances, seamless bricks and bricks are sewn around 1.5mm, which cannot exceed 2mm, and tile bricks with radian edges are about 3mm. In addition, you should also check whether there are missing corners in walls and floor tiles.

5. Ceiling: To inspect the ceiling, it is necessary to check whether the wooden keel of the ceiling is coated with fireproof material. The second is to check the spacing of the boom. The distance between the boom cannot be too large or it will affect its bearing capacity. The spacing should be between 600mm-900mm. Again, check the stability of the boom and see if it is rocking. The boom should be fixed with expansion bolts. Some of the foremen use woodbolts for cost savings and it is difficult to guarantee the stability of the boom. The boom must be fixed with expansion bolts in the vertical direction and plastic bolts in the transverse direction. Finally, the flatness of the keel should be checked by means of a pull wire.

6, wall, top: Acceptance wall, the top should check the flatness of its putty, you can use the ruler to test, the error is within 2-3mm as qualified. Owners should pay special attention to whether the yin and yang angles are square and straight when they are inspecting the wall surface and the top surface.

7, wood products: For the production of wood products at the scene should first pay attention to whether its appearance meets the design requirements, the size is accurate. The wooden doors produced on site shall also be checked whether the opening direction of the doors is reasonable. The door joints above and below the wooden doors shall not exceed 3 mm, and the bottom seams shall generally be 5-8 mm. In addition to viewing the door seams, it should also be checked whether the joints in the door pockets are tight.

If the owner finds a problem during the mid-term acceptance, he shall immediately report to the supervisor for rectification. After the rectification is completed, the supervisor shall notify the owner of the re-acceptance.

Third, the acceptance of the final acceptance of home improvement

The acceptance at the end of the period is relatively simple compared to the mid-term acceptance. It mainly tests the closing part of the medium-term project. Such as wood products, wall surface, top surface, the owner can test the smoothness of its surface paint, paint, whether there is flow phenomenon and the color is consistent.

The circuit mainly checks whether the wiring of the socket is correct and whether the power is on, and the socket of the bathroom should be provided with a waterproof cover. The inspection of the waterway reform is still the focus. The owner needs to check whether there is a "back slope" in the room where there is a floor drain. The inspection method is very simple: open the tap or shower, and after a certain period of time, see whether the flowing water is smooth and whether there is local water accumulation. In addition, the smoothness of the floor drains, the toilet and the wash basin should be checked.

In addition to the acceptance of the final part of the medium-term project, the owner should also accept home improvement projects such as flooring and plastic windows. When inspecting the floor, you should check whether the color of the floor is the same, whether there is any warping or noise. Acceptance plastic window, you can check the edge of the plastic window is left with 1-2cm gap filled with styrofoam. In addition, the solidity of the steel window should also be checked. Under normal circumstances, every 60-90cm should be hit with a bolt to fix the plastic window. If the fixing bolt of the plastic window is too small, the use of the plastic window will be affected.

In the end of acceptance of home decoration, consumers should also pay attention to some of the details, such as whether the pipeline for the kitchen, bathroom, check the spare port, whether the water meter, gas meter is easy to read and so on.

Hidden Projects Home Furnishing Room Sockets Painted Floor Tiles Kitchen Wall Tiles Villa Doors Bathroom Tiles Bathroom Doors Bathroom Tiles Color Bathroom Wall Tiles Bathroom Door Size Bathroom Size Toilet Ceiling Material Bathroom Ceiling Overall Bathroom Toilet Design Toilet Waterproof Bathroom Floor Tiles Toilet Leaking Floor Tile Tile Tile Rubber Cottage Villa area kitchen tiles