New house decoration acceptance skills inventory

The new house has been renovated. How to test the results of new house renovation? It is invisible from the overall effect alone, because from a rough room or old house to the decoration, the visual is very good, so how to test the results of new house decoration to start with the details.

â—† Check the quality of new houses in detail, including cracks in doors, windows and balconies.

[Acceptance skills]

Before the acceptance of the new house, due to the long time for the new house to be closed, there will be some dust and construction debris in the door and window track. Therefore, it is not possible to forcefully push and pull the doors and windows. When you feel a sense of obstruction, take a closer look and clear it with a broom. You can check it out.

â—† Check the flatness of the wall, see if it seeps, and if there is any crack.

[Acceptance skills]

In the acceptance of new houses, in particular, check whether there are water traces on some walls, especially some gables, kitchen tops, exterior walls, etc. If any, be sure to find out the reasons as soon as possible.

â—† Carefully inspect the ground for cracks in the empty shell.

[Acceptance skills]

If there is any empty drum in the acceptance of the new house, it must be instructed to accompany the property personnel to repair it as soon as possible, otherwise it will be easy to break through the floor during the renovation and hinder the relations between the neighbors. The above 2-3 items can be used to check the small tool and feeler gauge.

â—† The smooth flow of utility coal and whether it can be used normally.

[Acceptance skills]

Open up the tap to check for leaks, try to make the flow bigger and anxious. Let's take a look at the water pressure and try the drainage speed. Use a multimeter to measure whether each strong or weak power is unblocked.

â—† When the new house is closed, check the opening and closing to check whether each sub-gate completely controls each branch line.

[Acceptance skills]

When the new house is accepted into the water, it is first used to hold the water in the basin, and then it is filled with water in various places. These are the basin water, the bathtub water, the toilet water, the kitchen and the sanitary and balcony floor drains, etc. Basically, each sink should be filled with two basins. Around the water, you should hear the noise and surface water.

â—† Acceptance of waterproof engineering

[Acceptance skills]

Acceptance of the new housing ground when the toilet water in the toilet, shallow on the line (about 2cm high). Then the owners downstairs check the ceiling of their home toilet after 24 hours.

â—† Check whether there are any omissions, brands, and quantities in the facilities and equipment specified in the sales contract.

[Acceptance skills]

Usually, there should be no big problem in this area, but it is really necessary to verify it carefully.

â—† Measure the height of the building.

[Acceptance skills]

With a 5 meter tape, you can sample the data source location and specific data. It is best to record the water meter, meter number, building height, toilet pit distance, bathtub length and width, shower room size, ceiling height in a small notebook. At the same time, the data and questions of some acceptance houses were written on the paper provided by the property company.

After checking the work at the end, if there are any problems, it is necessary to determine the solution and the date of settlement with the property person to see if the result of the settlement will affect the collection of the house. If it does, it will require negotiation.

Construction acceptance new house window toilet house decoration house kitchen sliding door

Soap Holder

Soap Holder,How to Install Soap Holder,Brass Soap Basket,Installing Soap Holder in Shower

Kaiping Jenor Sanitary Ware Co., Ltd , https://www.jmjenorsanitary.com