The most attention should be paid attention to decoration

[Abstract] This article describes some of the construction processes and decoration traps that are most likely to be cut by construction workers. You should pay attention to the decoration supervision and inspection. Especially in small places where the eyes can't see and don't pay much attention, you shouldn't ignore any details when checking the quality of the project. The following are the construction process and decoration traps that are most likely to be cut by construction workers. You should pay attention to the decoration supervision and inspection.

Base

Before applying latex paint and applying tiles, be sure to handle the substrate. Some workers cut corners and cut materials in this regard during construction, and the unevenness caused uneven wall surface. After the paint is applied, there is a color difference. When the paint is applied, the paint is discolored and peeled off, or the ceramic tile is not firmly bonded. In the construction of paving tiles, you should pay attention to the fact that tiles cannot be laid directly on the surfaces of lime mortar, lime paste, lime paste, hemp plaster and latex paint. Bonding pastes used between tiles and substrates should be formulated in strict accordance with construction standards and proportions, use the specified grade of cement, adhesive glue materials, can not be freely deployed, you must pay attention to the wall putty when painting latex paint Whether the shaver is even and smooth, whether the grinding and roller coating is in place or not. In addition, you should pay attention to whether the latex paint is properly proportioned and whether there is excessive water.

Wall paint

Latex paint is the most common wall decoration material at present, and can be painted, rolled or sprayed in specific construction. If the workers are not serious or perfunctory during construction, small color differences often occur. Especially with deeper emulsion paints, this problem is more likely to occur. Therefore, before the use of latex paint, it is necessary to add a certain amount of fresh water, and a good latex paint is used up once. Paints of the same color are also best painted once. If the wall needs to be repaired after construction, the whole wall should be repainted again.

Paving

Paving tiles are a highly technical process. If workers cut corners, they are most prone to problems such as empty tiles, missing seams, and cement and adhesives used for laying tiles. If the ratio is unreasonable, there will be problems such as shedding. According to experts, wall and floor tiles should be flat and firm, with clear patterns, no dirt and grout marks, and the same surface color, uniform joints, no cracks, missing corners, and lack of edges, and local hollowing should not exceed 5% of the total.

Underwater pipe

When the construction team is carrying out renovations, they sometimes dump large amounts of cement, sand, and concrete into the sewers to save time. The direct consequence of this is a serious blockage of the sewer, causing the kitchen and toilet to run out of water due to poor water. Although some projects have no problems in the final acceptance, they always have problems with poor water. Experts advise: Strict supervision of the construction team, can not use the sewer as rubbish use. After the construction of the waterway is completed, all the basins, basins and bathtubs are filled with water, and then the water is discharged at the same time to see if the water is unobstructed and if there is any leakage of the pipeline.

Wall tick

The buried pipeline must be slotted on the wall and ground in order to bury the pipeline. A few workers perform barbaric construction during the grooving operation, which not only damages the building load-bearing structure, but also may cause damage to other nearby pipelines. The expert reminds that before the construction, it is necessary to reconfirm the direction and location of the pipeline with the construction team leader. For different wall structures, the requirements for slotting are not the same: the walls of the load-bearing wall in the house are not allowed to be slotted, and the wall with the insulating layer is easy to cause cracking on the surface after being slotted, and on the ground Slotting, but also be careful not to damage the floor, causing trouble to the residents downstairs.

Leveling

Some houses are not well-grounded and need to be re-leveled during the renovation. If the workers are not careful or deliberately rigged, it will cause the problem of “more and more inequality”. Therefore, before ground leveling, ground surface treatment must be done first, and then cement mortar should be used to level the floor. After the cement is dried, the flatness of the entire floor is determined with a dedicated level ruler, and then the next step of construction is performed. .

Wire connector

When installing electric sockets, switches and lamps, electricians do not wire according to construction requirements. In particular, when consumers use some electric appliances such as water heaters and air conditioners that consume large amounts of electricity, the switches and outlets are heated and even burned, causing great losses to consumers. Therefore, in the construction supervision of the electrician in strict accordance with the operating procedures for construction, after all the switches, sockets installed, must be the actual use to see if these parts have a fever.

Wire wear tube

In home renovation construction, almost all wires are put in PVC pipes and buried in the walls. Therefore, after the electric wire is put into the PVC pipe, the consumers cannot see it at all and it is difficult to replace it. If the worker is not careful in the operation, it will cause the wire to kink in the tube, causing electricity hazards. If the workers intentionally cut corners, they would use wire with connectors or put several wires in the same PVC pipe.

Therefore, it is advisable to buy the cords yourself and supervise the operation of the workers on-site. After the installation is complete, the electricity inspection must be performed. In addition, the decoration company must leave a “pipeline map” so that when the electrician has just buried the wires in the wall, they will number the walls and draw a plan, and then use the stroke to draw the direction and position of the wires. Note Clearly, the position of the pipe joints should be clearly marked on the floor, under the ground and near the wall. In this way, once the fault occurs, the line position can be immediately found.

Seam modification

In some places where the wall meets the door and the window, and where the two different colors of paint meet, it is also where the workers often perfunctory. You will often see mixed paint between latex paint and wood line, and various problems occur at the joints. If there are two colors of paint on the wall facing each other, it is necessary to apply adhesive tape on the edge of the first color during construction, and then apply another color of paint on it, so that the construction is completed. After tearing off the tape, the entire seam can be very neat.

other

In addition, small areas where the eyes can't see and don't pay much attention, such as the inside of the heating cover, the top of the door frame, and the bottom of the sill plate, are also prone to jerry-building or even no treatment. Therefore, when checking the quality of the work, you should not overlook any of them. detail.

Decorated catchy three trees paint entrance decoration paint latex paint concrete switch bathroom tile color bathroom tile bathroom floor tile bathroom door tile adhesive kitchen tile

For assembly carbon fiber tubes with kits, we designed and produced aluminum clampes for carbon fiber tubes. They are made of 6061-T6 aluminum material and plastic. Both are popular. Our standard sizes are  12mm,16mm,20mm,22mm,25mm,30mm. Round tube clamps,octagonal clamps,moveable clamps etc are available. If you need other size,material or shape, we could cutomize them for you according to your requirements. Please send us an RFQ with your specificationns if you need customize them. We could produce or customize them to fulfill your unique needs.

Tube Clamp

Round Tube Clamp,Steel Tube Clamps,Tube Clamps Stainless Steel,Pipe Clamp

Hobby Carbon CNC Technology(Shenzhen) Limited , http://www.hobbycarbon.com