Drain valve installation method

Multi-way drain valve must be mounted vertically on the horizontal pipe. Clean the pipe before installing the valve. 1. Turn the handwheel stem counterclockwise to drive the valve core to gradually move up and the sealing surface to disengage. The diversion seat on the valve core gradually moves out of the seat hole to form a narrow slit gap. The medium passes through the symmetrical orifice Into the seat inside, a small amount of medium out through the slit, the gradual reduction of system pressure. 2. Continue turning the handwheel counterclockwise to move the valve spool upwards. The orifice on the guide seat moves out of the valve seat cavity. More media is discharged smoothly after throttling through the guide seat and the valve sleeve. 3. Continue turning the handwheel counterclockwise to move the spool up to the fully open position. At this point, the media pressure is greatly reduced and large quantities of impurities are removed directly from the orifice of the valve sleeve and form a vortex at the inverted seal seat Clean the sealing surface to prevent impurities from adhering to the sealing surface. 4. Turn the valve clockwise, the valve stem drives the spool to move down. At this time, the blowdown is completed and the system pressure is low. The orifice area on the valve sleeve gradually decreases. The guide sleeve is near the valve seat and changes the medium flow direction. After throttling to a certain speed through the valve core and valve sealing surface, and gradually strengthen the sealing surface of the cleaning efforts. 5. Continue to rotate the handwheel, the guide seat on the valve core into the valve seat hole, the formation of narrow-slot throttling, due to the sewage close to the end of the media has less impurities, narrow gap between the guide sleeve and the seat to prevent the residual Of the tiny impurities flow into the sealing surface, the medium flows out quickly through the slit, thoroughly clean the sealing surface, to ensure that the sealing pair contacts zero leakage. 6. Continue turning the handwheel until the valve plug contacts the seal seat. Achieve sealing. Sewage valve body and the valve cover with a clamp-type connection, compact structure, easy removal, easy to install, the branch pipe for the welding connection. Sewage valve pressure from the tight seal structure, seal ring made of asbestos packing formed, the higher the media pressure, the better the seal. Drainage valve medium flows from the branch into the sewage, the valve for piston-type structure and boronizing treatment, corrosion-resistant long life erosion.

  High-temp wheels feature a standard operating temperature range from -30℃ (continuous service) to 280℃. These are molded from an exclusive engineered resin compound that offers non-marking floor protection, near zero water absorption, high load capacities, and long service life. A special manufacturing process enables these wheels to retain a consistent bearing bore even when exposed to elevated temperatures. Furthermore, Thermo wheels are 100% recyclable, and they are highly resistant to animal fats, vegetable oils, and salt solutions. The life expectancy of Thermo wheels is three times longer than high-temp phenolic wheels, and they offer an equal load capacity. Unlike high-temp phenolic wheels, Thermo wheels have no outer skin that can break and absorb water or other fluids. Medium Duty High Temperature Casters can bear 90-120kg load. 

Medium Duty High Temperature Casters

Medium Duty High Temperature Casters, Black TPR High Temperature Caster, Brown TPR High Temperature Caster

Ningbo Mywin Caster Co., Ltd. , http://www.mywin-caster.com