Kitchen decoration is easy to ignore the details of several hidden dangers analysis

The kitchen is one of the most challenging areas to keep clean in any home. It requires special attention during the decoration process, as many details are often overlooked. Have you considered all the important aspects when planning your kitchen renovation?

When it comes to hidden works in a kitchen, the main focus is on water and drainage systems, electrical wiring, and the base layer of the floor and walls. Among these, the plumbing system is especially critical. While this may be a standard part of construction for professionals, it’s essential to remember that it directly impacts your safety and the long-term integrity of your home.

1. Drainage System

First, check if the water pipes are leak-proof. The layout of PP-R pipes should be logical—both horizontal and vertical. Make sure the pipes don’t come too close to electrical lines, keeping at least 0.2 cm of distance. Also, ensure that connections to fixtures like sinks and faucets are tight and tested for leaks after installation.

Next, evaluate the floor drainage. In kitchens and bathrooms, proper slope is crucial. A 2% slope helps water flow naturally toward the drain. However, avoid making the slope too steep, as it can affect the aesthetics and increase the risk of slipping.

Lastly, verify that the waterproofing layer is effective. Kitchens and bathrooms require higher waterproofing standards. The coating should be applied up to 1.8 meters high in these areas, while other rooms only need 0.3 meters.

2. Electrical and Pipeline Work

Check whether the PVC pipes are securely connected. All power cables must be protected by PVC conduits when installed in walls, ceilings, or floors. Avoid kinks or sharp bends, and use appropriate tools or elbows for smooth curves without wrinkles.

Proper protection of the PVC pipes is also important. After laying the wiring, place wooden boards on both sides or use cement mortar to create a protective layer. This prevents accidental damage during construction. Additionally, maintain a 50 cm gap between strong and weak electricity to reduce electromagnetic interference and enhance safety.

3. Floor Base and Wall Construction

The quality of the floor base is key. The original floor should be leveled with cement mortar, and the kitchen and bathroom should have a specific slope for proper drainage. This slope needs to be carefully measured to ensure effectiveness without compromising safety or appearance.

Regarding the partition wall base, first, confirm whether the structure uses red brick walls or cement fiberboards. In kitchens and bathrooms, it's common to build walls with red bricks, leaving an inspection port for future maintenance. The size of the opening should match the actual dimensions for easy access. Second, check if the cement is properly brushed onto the surface to improve tile adhesion and prevent loosening over time.

 

Color And Haze Meters

Color haze meter,LCD panel haze meter,Spectral transmittance haze meter

CHNSpec Technology (Zhejiang)Co.,Ltd , https://www.chnspec360.com