Radiator installation: the process is clear to avoid trouble

Heating is very necessary for every northern family, and the installation of the radiator not only affects the normal use of the radiator, but also causes many problems during the use of the radiator, so it is quite reasonable to understand the installation process of the radiator. important! Today, I will introduce you to the decoration house decoration network Xiaobian!


暖气片安装


Radiator installation process:

1. Slot the floor or wall. According to the depth or width of the pipeline, first slot the ground or the wall, and bury the exposed pipeline. It is best to ask the professional installer for centralized treatment.

2. Lay the branch pipe. The branch pipe is laid by the groove of the previous heat sink positioning position. After the laying is completed, the pipe can be protected by laying the steel groove according to the actual demand, and then the system is closed and water is pressed.

3. Install the sub-tank and the water collector. Water separators and sumpers are devices that distribute and collect water flow. During the installation process, the water separator should be kept level and cleaned after installation.

4. Radiator system pressure test. The pressure test is a crucial step in the installation of the radiator. Before the test, close the main pipe connecting the valve, and then open the radiator inlet valve with the pressure test equipment to test. The test pressure should be 1.5 times of the normal use pressure, and not less than the entire community pipe. The test pressure of the net can be no leakage within 3-5 minutes.

5. Heat sink construction. In order not to affect the overall renovation progress, heat sink construction and hydropower construction can be carried out simultaneously.

6. Install the radiator. Place the radiator smoothly, then connect the valve connector to the inlet and outlet valves, measure the flatness of the radiator with a level gauge, check that the pipe installation meets the requirements, and finally tighten the connector with pipe wrench reinforcement.



暖气片安装流程


7. Install the fireplace. When installing, pay attention to the installation distance between the wall-mounted boiler and the gas meter and gas stove. The distance between the three should be greater than 300mm. Do not have power lines and electrical equipment above the fireplace. The distance between the wall-hung boiler and other electrical equipment is also greater than 300mm. No explosives or other volatile dangerous goods shall be placed nearby. When installing, pay attention to tilting the flue down 2° or 3° to prevent condensation water from entering the interior of the boiler.

8. Check and accept the entire radiator system. Usually during construction, the worker will reserve a valve on the pipeline. After installation, the stamping test should be carried out to determine that there is no leakage, dripping, watering or soaking.

The above decoration home decoration network Xiaobian introduced to you the knowledge of the installation of the radiator here, in the use of the radiator must pay attention to the sealing of the radiator, do not leak and leak, etc., timely found in time to deal with! For more related knowledge, please pay attention to the decoration encyclopedia section!


Mining Hoist Signal Device are designed according to coal industrial standard, it is consist of signal cabinet, signal table at the mine top, signal table at the mine bottom, audible and visual alarm, assistant signal device etc. PLC is its control core to realize data collection, logical  calculating and processing, and output control. To interactive transmit by CAN field bus technology; The audio bus technology is used to realize the communication function of duplex amplifiers. The device can be applied to 16 levels, the system wiring is convenient, safe and reliable.


Signal Products

Signal Station,Signal Booster,Signal Products,Signal Converter

Jiaozuo Huafei Electronic & Electric Co., Ltd. , https://www.intelligentmine.com