Want to renovate the decoration before the renovation must be completed in advance
2025-09-12 07:33:26
As the Spring Festival approaches earlier this year, many new homeowners are rushing to move in and start their renovations. However, with limited time—only about 40 days available before the holiday—careful planning is essential to ensure a smooth process. From material preparation to scheduling, every step must be carefully managed to avoid delays.
**Essential Preparations Before Renovation**
Before starting any work, it's crucial to obtain permission from the property management, especially if the house is not yet occupied. A heating system is necessary during winter to maintain a comfortable working environment for the workers and to speed up drying times for paint and other materials. Without heat, the painting process can slow down significantly, affecting the overall timeline.
**Material and Design Readiness**
Prior to the renovation, all major items such as cabinets, bathroom fixtures, and flooring should be finalized in terms of model, size, and layout. This ensures that the plumbing and electrical systems can be properly planned. If these details are not set early on, it could lead to delays or even rework later on. It’s recommended to leave at least a week for material selection and design finalization to avoid last-minute issues.
**Main Materials Must Be Ready**
One of the biggest challenges when renovating close to the New Year is coordinating the delivery of main materials. Items like cabinets and wooden doors often require long processing times, so it’s important to place orders early. Most cabinets take around 45 days to produce, while wooden doors may take 15–20 days. Scheduling measurements and expedited production can help keep things on track.
**Project Timeline Overview**
- **Days 1–7: Electrical and Plumbing Work**
Begin by updating the electrical and plumbing systems based on your design. Ensure that sockets and switches are placed in convenient locations that won’t be blocked by furniture later. This phase usually takes 5–10 days depending on the complexity.
- **Days 8–22: Tiling and Waterproofing**
After the plumbing is done, the tiling process begins. Kitchens and bathrooms need special attention, as tiles must be installed before cabinets can be measured. A 24-hour water test is also required after waterproofing to check for leaks.
- **Days 23–32: Painting and Cross-Operations**
While the bricklayers are working, painters can begin preparing by applying putty and sanding. This cross-operation helps save time. However, coordination is key to avoid conflicts and ensure quality.
- **Days 33–40: Installation of Fixtures and Final Touches**
In the final stage, install cabinets, wooden doors, and lighting. Pay close attention to door sizes and alignment. Also, prepare thresholds and transition strips where floors meet doorways or balconies.
**Additional Tips**
- **Avoid Leaving Bricklaying Until Later**
If you plan to finish some work after the New Year, it’s best to complete the bricklaying first. Leaving it for too long can cause inconsistencies in the mortar and result in uneven tiles.
- **Renovating Around the New Year Has Its Benefits**
The break can actually help identify issues that might not be visible during active construction. For example, cracks or color variations may appear after a month of rest, allowing for timely repairs before the end of the project.
With proper planning and communication, a quick renovation before the New Year is entirely possible. By staying organized and proactive, homeowners can enjoy a fresh, beautiful space ready for the holidays.